Skip to content
Space Rocket History #185 – Apollo 10 – Preparations episode artwork

Mar 11, 2021 24 min

Space Rocket History #185 – Apollo 10 – Preparations

from Space Rocket History Archive Hosted by Michael Annis

Although the contractors had shipped excellent spacecrafts, preparations at Kennedy did not go quickly from the assembly building to the launch pad. Testing was delayed several days in order to stay out of the way of Apollo 9 pre-flight activities. Also during maintenance to the Launch Control Center, the electrical power was switched off to replace a valve. The Apollo 10 launch vehicle’s pneumatic controls sensed the power outage, opened some valves and dumped 20,000 liters of fuel on the launch pad.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Space Rocket History #185 – Apollo 10 – Preparations

0:00 24:50

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Space Rocket History Archive?

This episode is 24 minutes long.

When was this Space Rocket History Archive episode published?

This episode was published on March 11, 2021.

Can I download this Space Rocket History Archive episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.