SPECIAL Ep 70 Golden Gate Bridge episode artwork

EPISODE · Feb 26, 2023 · 27 MIN

SPECIAL Ep 70 Golden Gate Bridge

from FAILUROLOGY · host Nicole Imeson & Brian Moynihan

Engineering News – Microplastic Magnets in Water (1:10) This week’s engineering marvel is the Golden Gate Bridge (3:20). After decades of design considerations (6:10) the Golden Gate Bridge opened in 1937 (16:40). 86 years later, San Francisco is working hard to maintain (21:00) the iconic bridge. Check out our Patreon page for Mini Failure bonus episodes - https://www.patreon.com/failurology Photos/Sources/Summary from this episode - https://www.failurology.ca/ Ways to get in touch Twitter - https://twitter.com/failurology Email - [email protected] Linked In - https://www.linkedin.com/company/failurology-podcast YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg

Episode metadata supplied by the publisher feed · Published Feb 26, 2023

Embed this episode

NOW PLAYING

SPECIAL Ep 70 Golden Gate Bridge

0:00 27:41

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of FAILUROLOGY?

This episode is 27 minutes long.

When was this FAILUROLOGY episode published?

This episode was published on February 26, 2023.

Can I download this FAILUROLOGY episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!