Springbank Dam
from Afternoons with Rob Breakenridge Hosted by CHQR / Curiouscast
The cost for the Springbank dam has jumped to $182 million over the original cost. Bruce McAllister, Executive Director Rocky View 2020 weighs in.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Afternoons with Rob Breakenridge?
This episode is 13 minutes long.
When was this Afternoons with Rob Breakenridge episode published?
This episode was published on August 14, 2017.
Can I download this Afternoons with Rob Breakenridge episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.