EPISODE · Sep 4, 2026 · 2 MIN
Stage change in IDOT Illinois 23 construction project in Ottawa begins
from Illinois Valley - Shaw Local · host Shaw Local News Network
Work during this stage will require the closure of all ramps at the Illinois 23 interchange starting at 6 p.m. Wednesday, Sept. 2, for pavement patching. All ramps are expected to reopen by 10 a.m. the following day, Thursday, Sept. 3.
Embed this episode
Ready to play
Stage change in IDOT Illinois 23 construction project in Ottawa begins
0:00
2:07
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Illinois Valley - Shaw Local?
This episode is 2 minutes long.
When was this Illinois Valley - Shaw Local episode published?
This episode was published on September 4, 2026.
Can I download this Illinois Valley - Shaw Local episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!