EPISODE · Sep 7, 2025 · 1 MIN
Star tracker testing – 9 February 2018
from Lightcurve Films
PicSat Project Manager Vincent Lapeyrere, together with internship student Mathurin Grenot, is testing the proper working of the star tracker on the PicSat Flight Model. Test in the clean of LESIA / Observatoire de Paris - PSL on 15 November 2017.
Embed this episode
NOW PLAYING
Star tracker testing – 9 February 2018
0:00
1:09
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Lightcurve Films?
This episode is 1 minute long.
When was this Lightcurve Films episode published?
This episode was published on September 7, 2025.
Is there a transcript available for this episode?
Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.
Can I download this Lightcurve Films episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!