SteelCast S3 E37: Rolling, rolling, rolling! Port Talbot's multi-million pound Mills makeover episode artwork

EPISODE · Jun 19, 2025 · 31 MIN

SteelCast S3 E37: Rolling, rolling, rolling! Port Talbot's multi-million pound Mills makeover

from SteelCast · host Tata Steel UK

Our £1.25 billion green steelmaking journey goes way beyond our Electric Arc Furnace...   A significant and critical part of the investment is also being spent on extending the life of Port Talbot’s Hot Rolling Mill and investing in a brand new Pickle Line. These upgrades will ensure the low-CO₂ steels from our Electric Arc Furnace are processed as effectively as possible before going for further processing or direct to customers. Join Host Tim Rutter, as Mills CAPEX Lead Andrew McGregor walks us through all the changes being planned – there are a LOT!   Watch this episode on YouTube: https://youtu.be/VSRZ8sLejbg   Follow Tata Steel UK on social media: Twitter: https://www.twitter.com/tatasteeluk Facebook: https://www.facebook.com/tatasteeluk Instagram: https://www.instagram.com/tatasteeluk/ LinkedIn: https://www.linkedin.com/company/tata-steel-uk-ireland   #GreenSteelFuture

Episode metadata supplied by the publisher feed · Published Jun 19, 2025

Embed this episode

NOW PLAYING

SteelCast S3 E37: Rolling, rolling, rolling! Port Talbot's multi-million pound Mills makeover

0:00 31:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of SteelCast?

This episode is 31 minutes long.

When was this SteelCast episode published?

This episode was published on June 19, 2025.

Can I download this SteelCast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!