EPISODE · Apr 13, 2026 · 3 MIN
Sterling footbridge installation waiting on Union Pacific, ComEd action
from Sauk Valley News - Shaw Local · host Shaw Local News Network
The sections of the 160-foot pedestrian bridge that will link the multi-use path along Sterling’s riverfront over state Route 40 have been delivered. But when the pedestrian bridge will be installed depends on action from Union Pacific Railroad regarding a single utility pole.
What this episode covers
The sections of the 160-foot pedestrian bridge that will link the multi-use path along Sterling’s riverfront over state Route 40 have been delivered. But when the pedestrian bridge will be installed depends on action from Union Pacific Railroad regarding a single utility pole.
NOW PLAYING
Sterling footbridge installation waiting on Union Pacific, ComEd action
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.