Sterling footbridge installation waiting on Union Pacific, ComEd action episode artwork

EPISODE · Apr 13, 2026 · 3 MIN

Sterling footbridge installation waiting on Union Pacific, ComEd action

from Sauk Valley News - Shaw Local · host Shaw Local News Network

The sections of the 160-foot pedestrian bridge that will link the multi-use path along Sterling’s riverfront over state Route 40 have been delivered. But when the pedestrian bridge will be installed depends on action from Union Pacific Railroad regarding a single utility pole.

Episode metadata supplied by the publisher feed · Published Apr 13, 2026

Embed this episode

NOW PLAYING

Sterling footbridge installation waiting on Union Pacific, ComEd action

0:00 3:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Sauk Valley News - Shaw Local?

This episode is 3 minutes long.

When was this Sauk Valley News - Shaw Local episode published?

This episode was published on April 13, 2026.

Can I download this Sauk Valley News - Shaw Local episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!