Sterling footbridge installation waiting on Union Pacific, ComEd action episode artwork

EPISODE · Apr 13, 2026 · 3 MIN

Sterling footbridge installation waiting on Union Pacific, ComEd action

from Sauk Valley News - Shaw Local · host Shaw Local News Network

The sections of the 160-foot pedestrian bridge that will link the multi-use path along Sterling’s riverfront over state Route 40 have been delivered. But when the pedestrian bridge will be installed depends on action from Union Pacific Railroad regarding a single utility pole.

The sections of the 160-foot pedestrian bridge that will link the multi-use path along Sterling’s riverfront over state Route 40 have been delivered. But when the pedestrian bridge will be installed depends on action from Union Pacific Railroad regarding a single utility pole.

NOW PLAYING

Sterling footbridge installation waiting on Union Pacific, ComEd action

0:00 3:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Sauk Valley News - Shaw Local?

This episode is 3 minutes long.

When was this Sauk Valley News - Shaw Local episode published?

This episode was published on April 13, 2026.

What is this episode about?

The sections of the 160-foot pedestrian bridge that will link the multi-use path along Sterling’s riverfront over state Route 40 have been delivered. But when the pedestrian bridge will be installed depends on action from Union Pacific Railroad...

Can I download this Sauk Valley News - Shaw Local episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!