Skip to content
Storage Space episode artwork

EPISODE · Aug 26, 2020 · 51 MIN

Storage Space

from The Electric Wire · host Customers First! Coalition

Today we begin to unpack energy storage from a customer angle and discuss the first “storage as transmission only asset” project being developed in Wisconsin. First, CFC Executive Director Kristin Gilkes interviews Tom Content, Executive Director of the Citizens Utility Board (CUB), to discuss potential customer benefits from increased use of energy storage and how CUB will evaluate utility storage proposals going forward. Our second interview is with Bob McKee, Strategic Projects Director at American Transmission Company, who gives an overview of the company’s “SATOA” project impetus, timeline, and multi-faceted benefits. Interview start times: Tom Content – 3:29 Bob McKee - 21:10 Links discussed in the podcast: WisEye.org archived coverage of energy storage presentation at the CFC Game Changers Power Breakfast (link will start at ~57:00 mark): https://wiseye.org/player/?clientID=2789595964&eventID=2019021061&startStreamAt=3427 Wisconsin Energy Distribution and Technology Innovation Report: https://www.m-werc.org/wedti-report MISO Generator Interconnection Queue – Active Projects Map: https://api.misoenergy.org/PublicGiQueueMap/index.html

Episode metadata supplied by the publisher feed · Published Aug 26, 2020

Embed this episode

Ready to play

Storage Space

0:00 51:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Electric Wire?

This episode is 51 minutes long.

When was this The Electric Wire episode published?

This episode was published on August 26, 2020.

Can I download this The Electric Wire episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!