Story Mill Splash Pad Delayed episode artwork

EPISODE · Jun 17, 2026 · 1 MIN

Story Mill Splash Pad Delayed

from Bozeman News Today | 2 Min News | The Daily News Now!

Bozeman’s Story Mill Park is getting a splash pad — but not until June 26th, delayed for final tweaks. Designed to be water-wise with a recycling system, it’s a family-friendly oasis to beat the heat, featuring local touches like a water tower and cattails. Parents are thrilled, especially for extended summer playtime, while city officials hint at bigger aquatic plans ahead. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/95541eedf84cc68e

NOW PLAYING

Story Mill Splash Pad Delayed

0:00 1:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bozeman News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bozeman News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 17, 2026.

What is this episode about?

Bozeman’s Story Mill Park is getting a splash pad — but not until June 26th, delayed for final tweaks. Designed to be water-wise with a recycling system, it’s a family-friendly oasis to beat the heat, featuring local touches like a water tower...

Can I download this Bozeman News Today | 2 Min News | The Daily News Now! episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!