This episode of SoundNotes features 2 questions recently submitted by students from our CSM and CSPO classes. LeadingAgile’s Sarah Smith and I respond to the questions, sharing our thoughts, recommended practices, and things to watch out for. The two questions are: 1. Is it okay for the ScrumMaster to take on additional (non-ScrumMaster) work during the Sprint? 2. When you have unfinished work at the end of a Sprint, does it automatically carry over into the next Sprint, and should you re-estimate it before you begin working on it again? In responding to the first question we discuss the potential impact of planning for the SM to take on non-SM work during the Sprint, how that can impact the team’s ability to deliver and, if the SM takes on additional work, what should that work be? The second question focuses on the situation where you get to the end of the Sprint, you have partially completed work and many teams will automatically push that into the next Sprint. If you have partially completed work, let’s say it is a User Story that was originally estimated using Story Points, and it was an 8. If there are only a few minutes of work needed to complete that item in a future Sprint, why do some teams feel the urge to give it a new Story Point estimate (based on work remaining) and what impact does that behavior have on the Scrum Team’s velocity? If you have follow-up questions for Sarah or Dave, here is how you can reach them: Contacting Sarah Smith Web: https://www.leadingagile.com/guides/sarah-smith/ LinkedIn: https://www.linkedin.com/in/sarahleasmith/ Contacting Dave Prior If you’d like to contact Dave you can reach him at: LeadingAgile: https://www.leadingagile.com/guides/dave-prior/ LinkedIn: https://www.linkedin.com/in/mrsungo Twitter: https://twitter.com/mrsungo Email: [email protected] If you have a question you’d like to submit for an upcoming podcast, please send them to [email protected]  

Episode metadata supplied by the publisher feed · Published Jul 16, 2019

Embed this episode

NOW PLAYING

Student QA: Can the ScrumMaster take on additional work? Should you re-estimate unfinished work? w/ Sarah Smith

0:00 11:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of LiminalArc SoundNotes?

This episode is 11 minutes long.

When was this LiminalArc SoundNotes episode published?

This episode was published on July 16, 2019.

Can I download this LiminalArc SoundNotes episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!