Skip to content
Study on Screen Time Impacts and Balanced Parenting episode artwork

Oct 8, 2026 1 min

Study on Screen Time Impacts and Balanced Parenting

from The ConnectSafely Report with Larry Magid Hosted by ConnectSafely

A JAMA study linked high screen time with slightly lower academic and developmental outcomes. The study does not prove causation, says ConnectSafely education director Kerry Gallagher, who shares practical tips for parents to encourage healthy offline activities.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Study on Screen Time Impacts and Balanced Parenting

0:00 1:01

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The ConnectSafely Report with Larry Magid?

This episode is 1 minute long.

When was this The ConnectSafely Report with Larry Magid episode published?

This episode was published on October 8, 2026.

Can I download this The ConnectSafely Report with Larry Magid episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.