Subsea Cable Failures episode artwork

EPISODE · Apr 2, 2025 · 24 MIN

Subsea Cable Failures

from PowerPod · host Rameeza Haq Duggal, Vincenzo Poidomani, Jamie Bernthal-Hooker

In this episode, host Jamie Bernthal-Hooker is joined by offshore wind transmission and cable experts Rameeza Haq Duggal and Vincenzo Poidomani to discuss the increasing risks and costs of offshore cable failures. They discuss the recent failure of the Estlink 2 subsea cable between Finland and Estonia, the suspected involvement of a shadow fleet and the costly repairs now underway. The conversation also dives into broader industry risks and its estimated costs. With offshore wind and interconnector projects expanding rapidly, what does the future hold for cable reliability? Tune in for expert insights on one of the sector's most pressing challenges.

Episode metadata supplied by the publisher feed · Published Apr 2, 2025

Embed this episode

NOW PLAYING

Subsea Cable Failures

0:00 24:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of PowerPod?

This episode is 24 minutes long.

When was this PowerPod episode published?

This episode was published on April 2, 2025.

Can I download this PowerPod episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!