Summer Work on the North Country Trail episode artwork

EPISODE · Jul 12, 2016 · 13 MIN

Summer Work on the North Country Trail

from Wandering Knight

It's time for summer trail maintenance on the North Country Trail (NCT). Andy and I maintain a section between 13 Mile road (Cleveland Drive) and 16 Mile Road in Newago County. The section also includes the side trail to Highbanks Lake Campground. All told the section is easily 6.5 miles long. This year we hoped to do a lot of re-blazing. Circumstances would rather dramatically affect our plans. Trail maintenance can be saticefying but it can be hard work too.  Learn more about the North Country Trail at their website northcountrytrail.org. Andy and I are part of the Western Michigan chapter. Get a visual sense of what things can be like from this short video on youtube (https://youtu.be/7iNYXnHSGnw)

Episode metadata supplied by the publisher feed · Published Jul 12, 2016

Embed this episode

NOW PLAYING

Summer Work on the North Country Trail

0:00 13:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Wandering Knight?

This episode is 13 minutes long.

When was this Wandering Knight episode published?

This episode was published on July 12, 2016.

Can I download this Wandering Knight episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!