Skip to content
Summit Tunnel - December 2010 episode artwork

Jan 3, 2021 51 min

Summit Tunnel - December 2010

from Signals to Danger

Just after Christmas, a train full of bleary-eyed travellers makes it's way across the Pennines. As they enter a tunnel at 70 miles an hour, the driver is horrified to see a wall of ice across the track. What went wrong, and hour could it have been prevented? Listen in to find out. Support the show

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Summit Tunnel - December 2010

0:00 51:58

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Signals to Danger?

This episode is 51 minutes long.

When was this Signals to Danger episode published?

This episode was published on January 3, 2021.

Can I download this Signals to Danger episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.