Suntado – Idaho’s First Vertically Integrated Dairy Processor episode artwork

EPISODE · Jun 5, 2024 · 20 MIN

Suntado – Idaho’s First Vertically Integrated Dairy Processor

from From the Cold Corner

Idaho’s first vertically integrated dairy processing plant opened just in time for June Dairy Month, with a focus on contract manufacturing. Suntado processes and packages on site with capacity for up to 1 million pounds of locally-produced milk per day into shelf-stable and extended shelf life (ESL) milk and liquid dairy products. The 190,000-square-foot facility is the first U.S. co-manufacturer to use TetraPak’s Tetra Top packaging. On this episode, we are joined by Tory Nichols, office of the CEO, Business Development, Suntado, Russ Lucas, Suntado plant manager, and Mat Rutz, vice president of contract manufacturing for Tetra Pak U.S. and Canada, to talk more about Suntado and the future of the dairy business.

Episode metadata supplied by the publisher feed · Published Jun 5, 2024

Embed this episode

Ready to play

Suntado – Idaho’s First Vertically Integrated Dairy Processor

0:00 20:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of From the Cold Corner?

This episode is 20 minutes long.

When was this From the Cold Corner episode published?

This episode was published on June 5, 2024.

Can I download this From the Cold Corner episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!