Swanton’s Rate Shock After Dam Failure episode artwork

EPISODE · Jun 3, 2026 · 1 MIN

Swanton’s Rate Shock After Dam Failure

from Burlington News Today | 2 Min News | The Daily News Now!

Swanton’s electric rates are skyrocketing over 30% starting May 1st, fueled by a catastrophic Highgate Dam bladder rupture last July. Now forced to buy 100% of its power from the open market, the village is scrambling to offset the cost surge. Local businesses like Green Mountain Bistro are cutting costs creatively, fearing rising prices could drive residents away. A partial dam repair is underway while a long-term fix is planned — and residents can apply for Vermont’s energy relief program. A public hearing on June 18th will detail the full impact. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/e37d709b59b700bb

Episode metadata supplied by the publisher feed · Published Jun 3, 2026

Embed this episode

NOW PLAYING

Swanton’s Rate Shock After Dam Failure

0:00 1:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Burlington News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Burlington News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 3, 2026.

Can I download this Burlington News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!