EPISODE · Jun 3, 2026 · 1 MIN
Swanton’s Rate Shock After Dam Failure
from Burlington News Today | 2 Min News | The Daily News Now!
Swanton’s electric rates are skyrocketing over 30% starting May 1st, fueled by a catastrophic Highgate Dam bladder rupture last July. Now forced to buy 100% of its power from the open market, the village is scrambling to offset the cost surge. Local businesses like Green Mountain Bistro are cutting costs creatively, fearing rising prices could drive residents away. A partial dam repair is underway while a long-term fix is planned — and residents can apply for Vermont’s energy relief program. A public hearing on June 18th will detail the full impact. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/e37d709b59b700bb
Embed this episode
NOW PLAYING
Swanton’s Rate Shock After Dam Failure
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.