EPISODE · Jul 27, 2016 · 26 MIN
T+14: The Post-EM-1 Roadmap for SLS, and Potential Uses for SpaceX’s BFR
from Main Engine Cut Off · host Anthony Colangelo
Before Mars and exploration-centric talk, I talk about Orbital ATK’s agreement for exclusive use of LMP-103S. Then I take a hard look at the post-EM-1 roadmap for SLS, and theorize some potential uses for SpaceX’s giant Mars-bound rocket—lovingly referred to as the Big F…alcon… Rocket (BFR). Orbital ATK and ECAPS Sign Agreement for Exclusive Use of LMP-103S - Main Engine Cut Off Orbital ATK News Room EM-1 Still on for Late 2018, SLS’ Second Flight Still A Mystery - Main Engine Cut Off First SLS mission on schedule for fall 2018 launch - SpaceNews.com Battle of the Heavyweight Rockets – SLS could face Exploration Class rival | NASASpaceFlight.com Email feedback to [email protected] Follow @WeHaveMECO Support Main Engine Cut Off on Patreon
Embed this episode
What this episode covers
Before Mars and exploration-centric talk, I talk about Orbital ATK’s agreement for exclusive use of LMP-103S. Then I take a hard look at the post-EM-1 roadmap for SLS, and theorize some potential uses for SpaceX’s giant Mars-bound rocket—lovingly referred to as the Big F…alcon… Rocket (BFR).
NOW PLAYING
T+14: The Post-EM-1 Roadmap for SLS, and Potential Uses for SpaceX’s BFR
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.