EPISODE · Jul 27, 2016 · 26 MIN
T+14: The Post-EM-1 Roadmap for SLS, and Potential Uses for SpaceX’s BFR
from Main Engine Cut Off · host Anthony Colangelo
Before Mars and exploration-centric talk, I talk about Orbital ATK’s agreement for exclusive use of LMP-103S. Then I take a hard look at the post-EM-1 roadmap for SLS, and theorize some potential uses for SpaceX’s giant Mars-bound rocket—lovingly referred to as the Big F…alcon… Rocket (BFR). Orbital ATK and ECAPS Sign Agreement for Exclusive Use of LMP-103S - Main Engine Cut Off Orbital ATK News Room EM-1 Still on for Late 2018, SLS’ Second Flight Still A Mystery - Main Engine Cut Off First SLS mission on schedule for fall 2018 launch - SpaceNews.com Battle of the Heavyweight Rockets – SLS could face Exploration Class rival | NASASpaceFlight.com Email feedback to [email protected] Follow @WeHaveMECO Support Main Engine Cut Off on Patreon
What this episode covers
Before Mars and exploration-centric talk, I talk about Orbital ATK’s agreement for exclusive use of LMP-103S. Then I take a hard look at the post-EM-1 roadmap for SLS, and theorize some potential uses for SpaceX’s giant Mars-bound rocket—lovingly referred to as the Big F…alcon… Rocket (BFR).
NOW PLAYING
T+14: The Post-EM-1 Roadmap for SLS, and Potential Uses for SpaceX’s BFR
No transcript for this episode yet
Similar Episodes
Sep 26, 2023 ·65m
Sep 26, 2023 ·66m
Sep 26, 2023 ·69m
Sep 26, 2023 ·64m
Sep 26, 2023 ·66m
Sep 26, 2023 ·61m