T+161: Mark Wiese, Manager of NASA’s Gateway Deep Space Logistics episode artwork

EPISODE · Jun 22, 2020 · 40 MIN

T+161: Mark Wiese, Manager of NASA’s Gateway Deep Space Logistics

from Main Engine Cut Off · host Colangelo Studios, LLC

Mark Wiese, Manager of NASA’s Gateway Deep Space Logistics, joins me to talk about the logistics architecture for Gateway and, specifically, the selection of SpaceX and Dragon XL for missions in the future. He even lets me get really nerdy and responds to some of my complaints and questions from past episodes!This episode of Main Engine Cut Off is brought to you by 38 executive producers—Brandon, Matthew, Simon, Kris, Pat, Matt, Jorge, Brad, Ryan, Nadim, Peter, Donald, Lee, Chris, Warren, Bob, Russell, John, Moritz, Joel, Jan, Grant, David, Joonas, Robb, Tim Dodd (the Everyday Astronaut!), Frank, Julian and Lars from Agile Space, Tommy, Adam, and seven anonymous—and 384 other supporters.TopicsMark Wiese (@MW_go4launch) / TwitterMark D. Wiese, Manager, Deep Space Logistics, Gateway Program | Kennedy Biographies | NASAAbout Gateway Deep Space Logistics | NASANASA Awards Artemis Contract for Gateway Logistics Services | NASASource Selection Statement for the Gateway Logistics Services ContractEpisode T+152: SpaceX’s Dragon XL Wins Gateway Logistics Services Contract - Main Engine Cut OffNASA Seeks Information for Gateway Cargo Delivery ServicesGateway Logistics Services - Main Engine Cut OffEpisode T+124: Gateway Logistics Services, FY2020 NDAA, and Small GEO Satellites - Main Engine Cut OffGateway Logistics Services - Draft RFP - beta.SAM.govThe ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOListen to MECO HeadlinesJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterBuy shirts and Rocket Socks from the Main Engine Cut Off ShopMusic by Max Justus

Episode metadata supplied by the publisher feed · Published Jun 22, 2020

Embed this episode

Mark Wiese, Manager of NASA’s Gateway Deep Space Logistics, joins me to talk about the logistics architecture for Gateway and, specifically, the selection of SpaceX and Dragon XL for missions in the future. He even lets me get really nerdy and responds to some of my complaints and questions from past episodes!

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+161: Mark Wiese, Manager of NASA’s Gateway Deep Space Logistics

0:00 40:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 40 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on June 22, 2020.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!