T+175: Delays episode artwork

EPISODE · Dec 5, 2020 · 25 MIN

T+175: Delays

from Main Engine Cut Off · host Colangelo Studios, LLC

A lot of big, long-running projects have faced delays recently, and it seems like as good a time as any to check in and share some related thoughts. I cover a lot in this one: the Orion PDU issue, Ariane 6, Japan’s H3, Dream Chaser, Vulcan, and New Glenn.This episode of Main Engine Cut Off is brought to you by 36 executive producers—Brandon, Matthew, Simon, Lauren, Melissa, Kris, Pat, Matt, Jorge, Ryan, Donald, Lee, Chris, Warren, Bob, Russell, John, Moritz, Joel, Jan, Grant, David, Joonas, Robb, Tim Dodd (the Everyday Astronaut!), Frank, Julian and Lars from Agile Space, Tommy, and seven anonymous—and 434 other supporters.TopicsComponent failure in NASA’s deep-space crew capsule could take months to fix - The VergeUpdate on Orion Final Assembly and Transfer – ArtemisNew Artemis 1 schedule uncertainty as NASA EGS ready to continue SLS Booster stacking - NASASpaceFlight.comNASA ‘Go’ for Green Run Wet Dress Rehearsal – ArtemisAriane 6 Slips to 2022, Needs Another €230 Million - Main Engine Cut OffESA requests €230 million more for Ariane 6 as maiden flight slips to 2022 - SpaceNewsJapan’s new H3 launcher delayed by rocket engine component issues - SpaceNewsFirst Dream Chaser mission slips to 2022 - SpaceNewsULA: Dream Chaser schedule slip not a setback to Vulcan certification - SpaceNewsULA on Twitter: “Off to the pneumatic test facility! This time lapse really shows the size of the #VulcanCentaur booster stage as it was transported to pressure testing. The booster is 5.4 m (17.7 ft) in diameter compared to #AtlasV’s common core booster that is 3.8 m (12.5 ft).”World's largest launch pad takes shape at Cape CanaveralStephen Marr on Twitter: “You literally never know what you’ll see in port! This morning, I spotted something that looks an awful lot like a launch mount, with a hole in the middle that looks big enough for a New Glenn!”The ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOListen to MECO HeadlinesJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterBuy shirts and Rocket Socks from the Main Engine Cut Off ShopMusic by Max Justus

Episode metadata supplied by the publisher feed · Published Dec 5, 2020

Embed this episode

A lot of big, long-running projects have faced delays recently, and it seems like as good a time as any to check in and share some related thoughts. I cover a lot in this one: the Orion PDU issue, Ariane 6, Japan’s H3, Dream Chaser, Vulcan, and New Glenn.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+175: Delays

0:00 25:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 25 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on December 5, 2020.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!