T+240: NSSL Phase 3, and a New Glenn Check In episode artwork

EPISODE · Feb 28, 2023 · 28 MIN

T+240: NSSL Phase 3, and a New Glenn Check In

from Main Engine Cut Off · host Colangelo Studios, LLC

The Space Force rolled out the draft RFP for Phase 3 of the National Security Space Launch program, and it looks pretty good! Elsewhere, NASA selected New Glenn to launch ESCAPADE in 2024, so I check in on the state of things over at Blue Origin—as always, it’s about the engines.This episode of Main Engine Cut Off is brought to you by 44 executive producers—Simon, Kris, Pat, Matt, Jorge, Ryan, Donald, Lee, Chris, Warren, Bob, Russell, Moritz, Joel, Jan, David, Joonas, Robb, Tim Dodd (the Everyday Astronaut!), Frank, Julian, Lars from Agile Space, Matt, The Astrogators at SEE, Chris, Fred, Dawn Aerospace, Andrew, Harrison, Benjamin, SmallSpark Space Systems, Tyler, Steve, Theo and Violet, Pat from KC and seven anonymous—and 821 other supporters.TopicsSpace Force to change how it buys national security launches - SpaceNewsSpace Force looks to energize industry with next round of launch contracts - SpaceNewsSpace Force Reimagining Launch Service Procurement – SpacePolicyOnline.comNational Security Space Launch (NSSL) Phase 3 DRAFT Request for Proposals (RFPs) #1 and Industry Day - SAM.govT+236: SpaceX Starshield, NSSL Phase 3 - Main Engine Cut OffEric Berger on Twitter: “Col. Douglas Pentecost of the US Air Force says the military recently signed a "three-flight" option with Blue Origin for certification of the New Glenn rocket. This means three flights, but less data than ULA had to provide for a two-flight certification.”Gallery | Blue OriginNASA Selects Blue Origin to Launch Mars’ Magnetosphere Study Mission | NASABlue Origin wins first NASA business for New Glenn - SpaceNewsAfter Vulcan comes online, ULA plans to dramatically increase launch cadence | Ars TechnicaThe ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOFollow @[email protected] on MastodonListen to MECO HeadlinesJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterMusic by Max JustusArtwork photo by SpaceX

Episode metadata supplied by the publisher feed · Published Feb 28, 2023

Embed this episode

The Space Force rolled out the draft RFP for Phase 3 of the National Security Space Launch program, and it looks pretty good! Elsewhere, NASA selected New Glenn to launch ESCAPADE in 2024, so I check in on the state of things over at Blue Origin—as always, it’s about the engines.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+240: NSSL Phase 3, and a New Glenn Check In

0:00 28:06

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 28 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on February 28, 2023.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!