T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger) episode artwork

EPISODE · Jul 18, 2023 · 47 MIN

T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)

from Main Engine Cut Off · host Colangelo Studios, LLC

Eric Berger of Ars Technica joins me to talk about the budgetary threat facing Mars Sample Return, the latest issue with ULA’s Vulcan vehicle, and the ongoing tweaks to the National Security Space Launch Program’s Phase 3 architecture.This episode of Main Engine Cut Off is brought to you by 35 executive producers—Will, Tyler, Ryan, Stealth Julian, Lars from Agile Space, Harrison, Craig from SpaceHappyHour.com, SmallSpark Space Systems, Pat, Theo and Violet, Tim Dodd (the Everyday Astronaut), Kris, Russell, Donald, Matt, Jan, Dawn Aerospace, Steve, Bob, Benjamin, Joel, Joonas, Lee, David, Warren, Frank, Simon, Fred, Chris, The Astrogators at SEE, Pat from KC, and four anonymous—and 833 other supporters.TopicsEric Berger (@SciGuySpace) / TwitterEric Berger | Ars TechnicaNASA’s Mars Sample Return has a new price tag—and it’s colossal | Ars TechnicaThe Senate just lobbed a tactical nuke at NASA’s Mars Sample Return program | Ars TechnicaVulcan’s upper stage failed due to higher stress and weaker welds | Ars TechnicaSpace Force to select three providers of national security launch services - SpaceNewsNational Security Space Launch (NSSL) Phase 3 DRAFT Request for Proposals (RFPs) #2Stephen Clark | Ars TechnicaThe ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOFollow @[email protected] on MastodonListen to MECO HeadlinesListen to Off-NominalJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterArtwork photo by ULAWork with me and my design and development agency: Pine Works

Episode metadata supplied by the publisher feed · Published Jul 18, 2023

Embed this episode

Eric Berger of Ars Technica joins me to talk about the budgetary threat facing Mars Sample Return, the latest issue with ULA’s Vulcan vehicle, and the ongoing tweaks to the National Security Space Launch Program’s Phase 3 architecture.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger)

0:00 47:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 47 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on July 18, 2023.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!