T+272: Moon Rovers, Space Stations, and Starships episode artwork

EPISODE · Apr 12, 2024 · 30 MIN

T+272: Moon Rovers, Space Stations, and Starships

from Main Engine Cut Off · host Colangelo Studios, LLC

NASA selected 3 teams to work on unpressurized rovers for Artemis, while Japan signed on officially to provide a pressurized rover in exchange for seats on Artemis landers. Elsewhere, Mitsubishi took a stake in Starlab, and I still needed to catch up on Starship’s 3rd flight and the ensuing update from SpaceX.This episode of Main Engine Cut Off is brought to you by 33 executive producers—Kris, Better Every Day Studios, Tyler, Joel, Fred, Harrison, Benjamin, Donald, Lee, Russell, Warren, Pat from KC, Matt, Bob, Ryan, Josh from Impulse Space, Tim Dodd (the Everyday Astronaut!), Pat, The Astrogators at SEE, SmallSpark Space Systems, Stealth Julian, Jan, Steve, Will and Lars from Agile Space, Theo and Violet, David, Joonas, Frank, and four anonymous—and 817 other supporters.TopicsNASA selects three companies to advance Artemis lunar rover designs - SpaceNewsJapanese astronauts to land on moon as part of new NASA partnership - SpaceNewsMitsubishi takes stake in Starlab Space - SpaceNewsStarship Flight 3 Excels through most Major Milestones - NASASpaceFlight.comSpaceX planning rapid turnaround for next Starship flight - SpaceNewsElon Musk just gave another Mars speech—this time the vision seems tangible | Ars TechnicaThe ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOFollow @[email protected] on MastodonListen to MECO HeadlinesListen to Off-NominalJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterArtwork photo by SpaceXWork with me and my design and development agency: Pine Works

Episode metadata supplied by the publisher feed · Published Apr 12, 2024

Embed this episode

NASA selected 3 teams to work on unpressurized rovers for Artemis, while Japan signed on officially to provide a pressurized rover in exchange for seats on Artemis landers. Elsewhere, Mitsubishi took a stake in Starlab, and I still needed to catch up on Starship’s 3rd flight and the ensuing update from SpaceX.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+272: Moon Rovers, Space Stations, and Starships

0:00 30:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 30 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on April 12, 2024.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!