T+276: Mars Sample Return Studies, NSSL Phase 3 Lane 1 Selections episode artwork

EPISODE · Jun 14, 2024 · 19 MIN

T+276: Mars Sample Return Studies, NSSL Phase 3 Lane 1 Selections

from Main Engine Cut Off · host Colangelo Studios, LLC

NASA selected the organizations who will be carrying out mission design studies for the Mars Sample Return rethink, and the US Space Force selected the first 3 bidders for the National Security Space Launch Program Phase 3 Lane 1.This episode of Main Engine Cut Off is brought to you by 33 executive producers—Lee, Kris, Joel, Ryan, Russell, Steve, Theo and Violet, Better Every Day Studios, Joonas, Harrison, Pat from KC, Tim Dodd (the Everyday Astronaut!), Frank, Josh from Impulse Space, Stealth Julian, SmallSpark Space Systems, Will and Lars from Agile Space, Tyler, Bob, Fred, Donald, Warren, The Astrogators at SEE, Jan, David, Matt, Benjamin, Pat, and four anonymous—and 817 other supporters.TopicsNASA Exploring Alternative Mars Sample Return Methods - NASANASA selects seven companies for MSR studies - SpaceNewsT+273: Mars Sample Return - Main Engine Cut OffBlue Origin, SpaceX, ULA win $5.6 billion in Pentagon launch contracts - SpaceNewsT+254: Mars Sample Return, Vulcan, NSSL Phase 3 (with Eric Berger) - Main Engine Cut OffT+255: NSSL Phase 3 Addendum - Main Engine Cut OffThe ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOFollow @[email protected] on MastodonListen to MECO HeadlinesListen to Off-NominalJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterArtwork photo by SpaceXWork with me and my design and development agency: Pine Works

Episode metadata supplied by the publisher feed · Published Jun 14, 2024

Embed this episode

NASA selected the organizations who will be carrying out mission design studies for the Mars Sample Return rethink, and the US Space Force selected the first 3 bidders for the National Security Space Launch Program Phase 3 Lane 1.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+276: Mars Sample Return Studies, NSSL Phase 3 Lane 1 Selections

0:00 19:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 19 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on June 14, 2024.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!