T+291: Axiom Updates Station Plans, Firefly Wins Another CLPS Mission episode artwork

EPISODE · Dec 21, 2024 · 20 MIN

T+291: Axiom Updates Station Plans, Firefly Wins Another CLPS Mission

from Main Engine Cut Off · host Colangelo Studios, LLC

Axiom Space announced changes to their station build out plan, bringing free-flying capability forward in their timeline and switching to a berthing port at the ISS to avoid the US Deorbit Vehicle. Firefly won another CLPS task order, this time for a lander with a rover, and for quite a bit more money than the last few.This episode of Main Engine Cut Off is brought to you by 32 executive producers—Josh from Impulse, Fred, Kris, Will and Lars from Agile, Pat, Ryan, Donald, Joel, Better Every Day Studios, Joakim (Jo-Kim), Jan, David, Pat from KC, Bob, Harrison, Joonas, Steve, Warren, The Astrogators at SEE, Tim Dodd (the Everyday Astronaut!), Russell, Lee, Matt, Stealth Julian, Theo and Violet, Frank, and four anonymous—and hundreds of supporters.TopicsAxiom Space revises space station assembly plans - SpaceNewsAxiom Space Accelerates Axiom Station AssemblyAxiom Station — Axiom SpaceMore NASA Science, Tech will Fly to Moon Aboard Future Firefly Flight - NASAThe ShowLike the show? Support the show!Email your thoughts, comments, and questions to [email protected] @WeHaveMECOFollow @[email protected] on MastodonListen to MECO HeadlinesListen to Off-NominalJoin the Off-Nominal DiscordSubscribe on Apple Podcasts, Overcast, Pocket Casts, Spotify, Google Play, Stitcher, TuneIn or elsewhereSubscribe to the Main Engine Cut Off NewsletterArtwork photo by SpaceXWork with me and my design and development agency: Pine Works

Episode metadata supplied by the publisher feed · Published Dec 21, 2024

Embed this episode

Axiom Space announced changes to their station build out plan, bringing free-flying capability forward in their timeline and switching to a berthing port at the ISS to avoid the US Deorbit Vehicle. Firefly won another CLPS task order, this time for a lander with a rover, and for quite a bit more money than the last few.

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

T+291: Axiom Updates Station Plans, Firefly Wins Another CLPS Mission

0:00 20:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Main Engine Cut Off?

This episode is 20 minutes long.

When was this Main Engine Cut Off episode published?

This episode was published on December 21, 2024.

Can I download this Main Engine Cut Off episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!