EPISODE · May 16, 2017 · 32 MIN
T+47: Uncrewed EM-1 Delayed to 2019
from Main Engine Cut Off · host Anthony Colangelo
Last week was rough for the Space Launch System. An issue with weld tooling was discovered, with some serious consequences, and then a LOX tank dome was dropped and damaged beyond repair. To top it off, NASA announced that EM-1 will fly without crew, and is delayed until 2019. This episode of Main Engine Cut Off is brought to you by 12 executive producers—Pat, Matt, Jorge, Brad, Ryan, Laszlo, Jamison, Guinevere, and four anonymous—and 46 other supporters on Patreon. NASA will not put a crew on EM-1, cites cost – not safety – as main reason | NASASpaceFlight.com SLS Core Stage team recovering from consequences of weld pin change | NASASpaceFlight.com NASA investigating damaged SLS tank section - SpaceNews.com Options for Staging Orbits in Cis-Lunar Space (PDF, 4.7MB) The Deep Space Gateway, Cislunar Staging Orbits, and Momentum - Main Engine Cut Off Email your thoughts and comments to [email protected] Follow @WeHaveMECO Subscribe on Apple Podcasts, Overcast, Google Play, Stitcher, or elsewhere Subscribe to the Main Engine Cut Off Newsletter Buy shirts and Rocket Socks from the Main Engine Cut Off Shop Support Main Engine Cut Off on Patreon
What this episode covers
Last week was rough for the Space Launch System. An issue with weld tooling was discovered, with some serious consequences, and then a LOX tank dome was dropped and damaged beyond repair. To top it off, NASA announced that EM-1 will fly without crew, and is delayed until 2019.
NOW PLAYING
T+47: Uncrewed EM-1 Delayed to 2019
No transcript for this episode yet
Similar Episodes
Sep 26, 2023 ·65m
Sep 26, 2023 ·66m
Sep 26, 2023 ·69m
Sep 26, 2023 ·64m
Sep 26, 2023 ·66m
Sep 26, 2023 ·61m