Tallahassee Power Line Work Closures episode artwork

EPISODE · Jun 17, 2026 · 1 MIN

Tallahassee Power Line Work Closures

from Tallahassee News Today | 2 Min News | The Daily News Now!

Major power line upgrades kick off Wednesday on Centerville Road between Betton Road and Trescott Drive—work runs seven days a week, 8:30 AM to 4:30 PM. Key impact: Trescott Drive intersection will be temporarily closed on Wed, June 17; Sat, June 20; Sun, June 21; and Fri–Sun, June 26–28. Centerville Townhomes residents still have access; others can enter Centerville Road only via local traffic during non-closure days. Plan detours—especially on those weekends. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/510d8abe86f83740

Episode metadata supplied by the publisher feed · Published Jun 17, 2026

Embed this episode

NOW PLAYING

Tallahassee Power Line Work Closures

0:00 1:11

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Tallahassee News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Tallahassee News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 17, 2026.

Can I download this Tallahassee News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!