EPISODE · Jul 8, 2026 · 11 MIN
Ted Geisler, APS President & CEO
Arizona Public Service (APS) announced today it plans to convert two units at its Cholla Power Plant in Joseph City to natural gas. We talked to Ted Geisler, president and CEO at APS about the change.
Embed this episode
NOW PLAYING
Ted Geisler, APS President & CEO
0:00
11:05
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Mike Broomhead Show?
This episode is 11 minutes long.
When was this The Mike Broomhead Show episode published?
This episode was published on July 8, 2026.
Can I download this The Mike Broomhead Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!