Ted Geisler, APS President & CEO episode artwork

EPISODE · Jul 8, 2026 · 11 MIN

Ted Geisler, APS President & CEO

from The Mike Broomhead Show

Arizona Public Service (APS) announced today it plans to convert two units at its Cholla Power Plant in Joseph City to natural gas. We talked to Ted Geisler, president and CEO at APS about the change. 

Episode metadata supplied by the publisher feed · Published Jul 8, 2026

Embed this episode

NOW PLAYING

Ted Geisler, APS President & CEO

0:00 11:05

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Mike Broomhead Show?

This episode is 11 minutes long.

When was this The Mike Broomhead Show episode published?

This episode was published on July 8, 2026.

Can I download this The Mike Broomhead Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!