EPISODE · Sep 9, 2025 · 56 MIN
TeraWulf's $3.7B Deal w/ Google, Block's Disruptive New ASIC, O&G Gets Into Power
from Energizing Bitcoin & Ai · host Justin Ballard & Jake Corley
Justin Ballard (@JLB_Oso) and Jake Corley (@jacobcorley) regroup to riff on miner-to-AI megadeals, gas-to-power plays, and a modular ASIC that could reset fleet economics.AI x Power x BitcoinThis week we break down:TeraWulf × Google – a 10-year, 200 MW hosting deal (headline $3.7B; options could push multiyear value far higher) and why clean, reliable electrons (nuke/hydro) earn a premium—and might end in outright M&A.Who’s Next? – the consolidation map: why Bitfarms (and possibly IREN/Iris) look “target-ready,” what MARA/RIOT are more likely to do, and how miner stock spikes telegraph hyperscaler interest.CoreWeave–Core Scientific Playbook – how long-dated revenue agreements morph into acquisitions when the real prize is energized, rack-ready capacity.Coterra’s Power Option – a 7-year gas sale to CPV’s 1.3 GW CCGT in Ward County with the right to buy ~250 MW/day indexed to ERCOT West—the first true Permian netback template and what it signals for E&Ps.Turbines, Permits & Sudoku – deposits and long lead times, GPA/air permits (NOx/CO₂), and the catch-22 between offtakes and hardware—why scale + compliance + capital win.Block’s Proto Miner – Apple-clean design, rack-side sub-90-second repairs (as pitched), modular hashboards, open-source fleet software, and a 10-year design life—what that does to uptime and capex cycles.The AI Arms Race – trillion-dollar capex, billion-dollar talent bids, China’s generation build-out, and why power-secure brownfield beats greenfield timelines.Where to Find Us IRL – Permian Power Conference (Midland, Sep 29–30) + Texas Capitol investor day/North American Blockchain Summit (Dallas, October).
What this episode covers
Justin Ballard (@JLB_Oso) and Jake Corley (@jacobcorley) regroup to riff on miner-to-AI megadeals, gas-to-power plays, and a modular ASIC that could reset fleet economics.AI x Power x BitcoinThis week we break down:TeraWulf × Google – a 10-year, 200 MW hosting deal (headline $3.7B; options could push multiyear value far higher) and why clean, reliable electrons (nuke/hydro) earn a premium—and might end in outright M&A.Who’s Next? – the consolidation map: why Bitfarms (and possibly IREN/Iris) look “target-ready,” what MARA/RIOT are more likely to do, and how miner stock spikes telegraph hyperscaler interest.CoreWeave–Core Scientific Playbook – how long-dated revenue agreements morph into acquisitions when the real prize is energized, rack-ready capacity.Coterra’s Power Option – a 7-year gas sale to CPV’s 1.3 GW CCGT in Ward County with the right to buy ~250 MW/day indexed to ERCOT West—the first true Permian netback template and what it signals for E&Ps.Turbines, Permits & Sudoku – deposits and long lead times, GPA/air permits (NOx/CO₂), and the catch-22 between offtakes and hardware—why scale + compliance + capital win.Block’s Proto Miner – Apple-clean design, rack-side sub-90-second repairs (as pitched), modular hashboards, open-source fleet software, and a 10-year design life—what that does to uptime and capex cycles.The AI Arms Race – trillion-dollar capex, billion-dollar talent bids, China’s generation build-out, and why power-secure brownfield beats greenfield timelines.Where to Find Us IRL – Permian Power Conference (Midland, Sep 29–30) + Texas Capitol investor day/North American Blockchain Summit (Dallas, October).
NOW PLAYING
TeraWulf's $3.7B Deal w/ Google, Block's Disruptive New ASIC, O&G Gets Into Power
No transcript for this episode yet
Similar Episodes
Mar 31, 2026 ·54m
Mar 27, 2026 ·14m
Mar 24, 2026 ·42m
Mar 20, 2026 ·42m
Mar 17, 2026 ·41m
Mar 13, 2026 ·44m