Tesla Is Hiding Crazy Optimus Progress 🦾🤫 episode artwork

EPISODE · May 16, 2026 · 10 MIN

Tesla Is Hiding Crazy Optimus Progress 🦾🤫

from HyperChange · host Gali

One of the biggest pieces of news on Tesla's conference call was an update on Optimus. Tesla is building a 1M unit per year factory in Fremont, California that is set to start production in July or August of this year. They are also building a 10M unit production line in Austin that is set to begin production next summer! Things are heating up! They are keeping the prototypes secret because of copy cats, but one thing is forsure Optimus is making crazy progress and will be coming soon. The big reveal when production starts is going to be crazy.My X:   / gfilche  HyperChange Patreon :)   / hyperchange   Disclaimer: I'm long Tesla this is not financial advice.

One of the biggest pieces of news on Tesla's conference call was an update on Optimus. Tesla is building a 1M unit per year factory in Fremont, California that is set to start production in July or August of this year. They are also building a 10M unit production line in Austin that is set to begin production next summer! Things are heating up! They are keeping the prototypes secret because of copy cats, but one thing is forsure Optimus is making crazy progress and will be coming soon. The big reveal when production starts is going to be crazy.My X:   / gfilche  HyperChange Patreon :)   / hyperchange   Disclaimer: I'm long Tesla this is not financial advice.

NOW PLAYING

Tesla Is Hiding Crazy Optimus Progress 🦾🤫

0:00 10:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of HyperChange?

This episode is 10 minutes long.

When was this HyperChange episode published?

This episode was published on May 16, 2026.

What is this episode about?

One of the biggest pieces of news on Tesla's conference call was an update on Optimus. Tesla is building a 1M unit per year factory in Fremont, California that is set to start production in July or August of this year. They are also building a 10M...

Can I download this HyperChange episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!