EPISODE · Aug 6, 2026 · 1 MIN
Testing the 14-Foot Bridge Model | Cincinnati News
from Cincinnati News Today | 2 Min News | The Daily News Now!
A 14-foot scale model of the new Brent Spence companion bridge is undergoing brutal wind tunnel tests to prove its strength—engineers are simulating gale-force winds, traffic loads, and river forces to ensure it’ll hold up under any pressure. With two disconnected decks and a design unlike anything before, the model even includes surrounding landmarks to study real-world wind interactions. Made with authentic materials, the model moves dramatically during tests—exaggerated but revealing. Now on display at Cincinnati’s Shaping Our City exhibit, it’s sparking curiosity and inspiring future engineers. Construction began earlier this year, with completion slated for 2031—and the full corridor project aiming to wrap by 2033. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/100bfe4f48a86e41
Embed this episode
NOW PLAYING
Testing the 14-Foot Bridge Model | Cincinnati News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.