Skip to content
Texas competes on everything except transmission episode artwork

Jul 8, 2026 50 min

Texas competes on everything except transmission

from Energy Capital Podcast Hosted by Joshua Rhodes and Nate

Texas built a competitive retail electricity market: consumers choose among roughly a hundred providers, and generators build power plants at their own risk with no guaranteed return. Transmission, the high-voltage lines that move power from where it is made to where it is used, runs on a different model. One utility builds each line and recovers every cost from ratepayers, plus a return, on time and on budget or not, and faces no competition. ERCOT’s latest reserve-margin forecast goes negative in 2029 and 2030. To close that gap, ERCOT and the PUC have directed utilities to build a high-voltage backbone from West Texas to the I-35 corridor, which Smitherman puts at $33 billion, rising toward $40 to $50 billion by completion. Under the monopoly model, that cost lands on ratepayers. On this week’s Energy Capital Podcast, Joshua Rhodes talks with Barry Smitherman, the only person to have chaired both the Public Utility Commission and the Railroad Commission of Texas and now chairman of Texans for Affordable Transmission, about bidding transmission out to non-incumbents under cost and timeline caps. He sat on both commissions during the CREZ buildout, Texas’s early-2000s program that moved West Texas wind to market, and saw competitive transmission work firsthand. 00:00 - Introduction & Texas Energy Landscape 05:31 - Permian Basin Load Growth and the 765 KV Lines 12:11 - Data Center Demand: Real vs. Speculative 14:09 - Texas Energy Fund and the Energy-Only Market 21:28 - How Texas Transmission Gets Built Today 23:13 - The Case for Competitive Transmission 31:46 - The Eastern Backbone and Cost Accountability 33:54 - Private Lines and Large Load Options 43:04 - Repealing SB 1938: The Path Inside ERCOT 44:34 - Getting Transmission Right: Future Tech and Landowners This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.texasenergyandpower.com/subscribe

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Texas competes on everything except transmission

0:00 50:23

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Energy Capital Podcast?

This episode is 50 minutes long.

When was this Energy Capital Podcast episode published?

This episode was published on July 8, 2026.

Can I download this Energy Capital Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.