EPISODE · Oct 5, 2023 · 17 MIN
Thames Super Sewer with Tideway
In today's episode, we will be discussing the Thames Tideway Tunnel, also known as the super sewer – an extensive £4.5bn upgrade to London's sewer system to meet the needs of a growing population, with a current estimated completion date of 2025. Hosted by John Kavanagh, Programme Director for Infrastructure at BusinessLDN, we speak with Andy Mitchelle CBE, Chief Executive at Tideway to explain how this vital project will transform London for the future. Follow us on Twitter at @_businessLDN or search on LinkedIn: BusinessLDN Music is provided by Coma-Media
NOW PLAYING
Thames Super Sewer with Tideway
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Jan 2, 2026 ·47m
Dec 21, 2025 ·46m