Thames Super Sewer with Tideway episode artwork

EPISODE · Oct 5, 2023 · 17 MIN

Thames Super Sewer with Tideway

from What Next For London?

In today's episode, we will be discussing the Thames Tideway Tunnel, also known as the super sewer – an extensive £4.5bn upgrade to London's sewer system to meet the needs of a growing population, with a current estimated completion date of 2025. Hosted by John Kavanagh, Programme Director for Infrastructure at BusinessLDN, we speak with Andy Mitchelle CBE, Chief Executive at Tideway to explain how this vital project will transform London for the future.  Follow us on Twitter at @_businessLDN or search on LinkedIn: BusinessLDN Music is provided by Coma-Media

Episode metadata supplied by the publisher feed · Published Oct 5, 2023

Embed this episode

NOW PLAYING

Thames Super Sewer with Tideway

0:00 17:06

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of What Next For London??

This episode is 17 minutes long.

When was this What Next For London? episode published?

This episode was published on October 5, 2023.

Can I download this What Next For London? episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!