The $1 Billion Ohio River Tunnel 2026: How Lane-Brayman Won and How Every GC Can Position for America's Aging Water Infrastructure Wave Before IIJA Funding Expires episode artwork

EPISODE · Jun 8, 2026 · 21 MIN

The $1 Billion Ohio River Tunnel 2026: How Lane-Brayman Won and How Every GC Can Position for America's Aging Water Infrastructure Wave Before IIJA Funding Expires

from The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success

Lane-Brayman JV won a $1 billion contract to build a tunnel under the Ohio River — one of the largest water infrastructure awards of 2026. As data center work faces political headwinds, IIJA water infrastructure money is flowing at full speed. This episode breaks down the tunnel win, explains the water infrastructure opportunity, and gives contractors a playbook to get prequalified and positioned before the window closes.

Episode metadata supplied by the publisher feed · Published Jun 8, 2026

Embed this episode

Ready to play

The $1 Billion Ohio River Tunnel 2026: How Lane-Brayman Won and How Every GC Can Position for America's Aging Water Infrastructure Wave Before IIJA Funding Expires

0:00 21:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success?

This episode is 21 minutes long.

When was this The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success episode published?

This episode was published on June 8, 2026.

Can I download this The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!