The “48-Hour Rule” That Shuts Your Build Down - Ep 032
from The MTDC Lounge Hosted by Matt Turner
DA approval isn’t permission to build. You need a Construction Certificate + PCA appointed, and you must allow the required notice period before a single thing is done to your home. Matt and Mitch break down Construction Certificates (CC) / certification plans, the final “handover point” where MT Design’s work becomes builder-ready documentation, and a certifier signs off that the project meets the National Construction Code. Book a free consult: https://mtdesign.com.au/consultation