The Ashuelot Bridge Rehabilitation with Tim Andrews episode artwork

EPISODE · Nov 15, 2022 · 32 MIN

The Ashuelot Bridge Rehabilitation with Tim Andrews

from Covered Bridges of New Hampshire · host Kim Varney Chandler

Kim interviews bridgewright Tim Andrews about the 1999 rehabilitation of the Ashuelot Bridge in Winchester.  This project won the first Palladio Award for covered bridges in 2003. Tim shares details about the work and interesting things they uncovered during the project.Links from the conversationGuidelines for Rehabilitating Historic Covered BridgesCovered Bridges and the Birth of American EngineeringLinks for Covered Bridges of New HampshirePhotos of the Ashuelot BridgeCovered Bridges of New HampshireSupport the show

Episode metadata supplied by the publisher feed · Published Nov 15, 2022

Embed this episode

Ready to play

The Ashuelot Bridge Rehabilitation with Tim Andrews

0:00 32:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Covered Bridges of New Hampshire?

This episode is 32 minutes long.

When was this Covered Bridges of New Hampshire episode published?

This episode was published on November 15, 2022.

Can I download this Covered Bridges of New Hampshire episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!