EPISODE · Dec 6, 2022 · 31 MIN
The Bath Bridge Rehabilitation with Sean James
from Covered Bridges of New Hampshire · host Kim Varney Chandler
Kim interviews engineer Sean James, Senior Vice President at Hoyle, Tanner & Associates in Manchester about the twenty-one month-long rehabilitation of the Bath Bridge in Bath, New Hampshire. Sean walks us through the process of carrying out a $2 million project on a 375’ covered bridge and shares some interesting stories he learned along the way. Links from the conversationHoyle, Tanner & AssociatesLinks for Covered Bridges of New HampshireCovered Bridges of New HampshirePhotos of the Bath BridgeSupport the show