The Bath Bridge Rehabilitation with Sean James episode artwork

EPISODE · Dec 6, 2022 · 31 MIN

The Bath Bridge Rehabilitation with Sean James

from Covered Bridges of New Hampshire · host Kim Varney Chandler

Kim interviews engineer Sean James, Senior Vice President at Hoyle, Tanner & Associates in Manchester about the twenty-one month-long rehabilitation of the Bath Bridge in Bath, New Hampshire. Sean walks us through the process of carrying out a $2 million project on a 375’ covered bridge and shares some interesting stories he learned along the way. Links from the conversationHoyle, Tanner & AssociatesLinks for Covered Bridges of New HampshireCovered Bridges of New HampshirePhotos of the Bath BridgeSupport the show

Episode metadata supplied by the publisher feed · Published Dec 6, 2022

Embed this episode

Ready to play

The Bath Bridge Rehabilitation with Sean James

0:00 31:19

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Covered Bridges of New Hampshire?

This episode is 31 minutes long.

When was this Covered Bridges of New Hampshire episode published?

This episode was published on December 6, 2022.

Can I download this Covered Bridges of New Hampshire episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!