The BERcast | Season 2 Episode 12 | The 2025 NYSECCC and the Delay on Electrification episode artwork

EPISODE · Dec 11, 2025 · 1H 1M

The BERcast | Season 2 Episode 12 | The 2025 NYSECCC and the Delay on Electrification

from The BERcast

In the Season 2 finale of The BERcast, Chris McTaggart is joined by special guests Michael Caruso and Anthony LoCascio to discuss the delay of NY State’s ban on installing fossil-fuel equipment in new residential buildings under seven stories, explore what a future all-electric code could look like, and examine the concerns, readiness, and pushback from builders, architects, contractors and other industry professionals—especially amid rising electricity costs.Energy Testing Services has released a helpful guide outlining the code's key updates to insulation and building envelope requirements, heating and cooling systems, energy modeling, and testing: https://www.energytestingservices.com/2025/09/08/new-york-state-energy-code-change-2025-eccc-of-nys/

Episode metadata supplied by the publisher feed · Published Dec 11, 2025

Embed this episode

Ready to play

The BERcast | Season 2 Episode 12 | The 2025 NYSECCC and the Delay on Electrification

0:00 1:01:48

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The BERcast?

This episode is 1 hour and 1 minute long.

When was this The BERcast episode published?

This episode was published on December 11, 2025.

Can I download this The BERcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!