The Bolt Report | 6 March
from The Bolt Report Hosted by News24
Chris Bowen's plans for an offshore wind farm in Victoria foiled as the negative environmental impacts of the project is exposed, the Albanese government's spin on the latest GDP figures revealed. Plus, the ABC slammed for pushing climate alarmism.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of The Bolt Report?
This episode is 50 minutes long.
When was this The Bolt Report episode published?
This episode was published on March 6, 2024.
Can I download this The Bolt Report episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.