The Chain Beneath The Chip
from BID/ASK Hosted by Rhaul Nasa
NVDA just dropped a monster quarter $81B in revenue, $91B Q2 guide, data center nearly doubling YoY. But the real trade isn't the headline. It's what Jensen can't ship fast enough. HBM is sold out through 2026. CoWoS packaging is maxed. Substrates are backlogged. We break down every layer of the AI supply chain bottleneck and the tickers that move when NVDA can't keep up with itself.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of BID/ASK?
This episode is 41 minutes long.
When was this BID/ASK episode published?
This episode was published on May 20, 2026.
Can I download this BID/ASK episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.