The Cost Snake Attacks Austin: Episode 28 episode artwork

EPISODE · Jan 3, 2023 · 51 MIN

The Cost Snake Attacks Austin: Episode 28

from The Red Line Podcast

Austin is making a second attempt at a grand rail transit system—their original plan narrowly lost the vote in 2000 despite robust federal funding, an arguably worse plan failed to pass in 2014, and finally, the current plan passed in 2020 by a relatively wide margin. This plan has a price tag of $10.3 billion and rising, much of that due to a long and extravagant downtown tunnel, with questionably necessary property acquisition contributing. We give an overview of transit history in Austin, discuss Project Connect itself, and poke at the beyond-outrageous prices being paid for each mile of this light rail system. The Great North American Cost Snake strikes a valiant transit effort once again! Links and stuffs Merch:https://shop.trlpod.com/ Twitter:@TheRedLine_pod YouTube channel:The Red Line Podcast Spotify:The Red Line Podcast Patreon:https://www.patreon.com/theredlinepodcasters Email:[email protected] Website:https://www.trlpod.com/ Timestamps Timestamps to be posted. References & notes [1]Mass Transit: MBTA opens Medford Branch of Green Line Extension [2]Austin's Streetcar Era [3]Wikipedia: Capital MetroRail [4]Wikipedia: Capital Metropolitan Transportation Authority § History [5]Wikipedia: Austin, Texas [6]Trolley Folly: A Critical Analysis of the Austin Light Rail Proposal [7]Wikipedia: Project Connect § MetroRail Gold Line [8]Reporting Texas: Project Connect and Austin's Past Light Rail Fails [9]Austin Rail Now: Austin’s 2000 light rail plan — Key documents detail costs, ridership of Lamar-Guadalupe-SoCo route [10]Light Rail Now: Campaign Continues for Austin Light Rail [11]The Austin Chronicle: Light Rail Never? [12]FTA: Capital Metro 2019 Annual Agency Profile [13]Smart Cities Dive: Behind the controversial $7.1B plan to transform transit in Austin, TX [14]KXAN Austin: Austin weighing street-level light rail in new Project Connect considerations [15]KXAN Austin: Project Connect light rails will likely cost $10.3B, twice as much as first planned [16]KXAN Austin: $10B Project Connect scope might change to combat inflation costs [17]Reuters: Car-centric Austin is building transit. Will anyone ride it? [18]Project Connect: Downtown Austin Transit Subway [19]Project Connect System Plan Overview [20]2014 Austin Strategic Mobility Plan [21]Austin Rail Now

NOW PLAYING

The Cost Snake Attacks Austin: Episode 28

0:00 51:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Red Line Podcast?

This episode is 51 minutes long.

When was this The Red Line Podcast episode published?

This episode was published on January 3, 2023.

What is this episode about?

Austin is making a second attempt at a grand rail transit system—their original plan narrowly lost the vote in 2000 despite robust federal funding, an arguably worse plan failed to pass in 2014, and finally, the current plan passed in 2020 by a...

Can I download this The Red Line Podcast episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!