The First Deployment of Construction Production 2.0 episode artwork

EPISODE · Jun 27, 2025 · 42 MIN

The First Deployment of Construction Production 2.0

from The Story Way · host Story Construction

In 2014, Rob Greenwood and Valarie Vizza were leading the second construction phase of the Workiva headquarters at the ISU Research Park when Story Construction leadership approached them about implementing a new system on the project called Construction Production 2.0. Listen as they recall their first impressions of the system and some early lessons learned in implementing CP 2.0 for the first time.

In 2014, Rob Greenwood and Valarie Vizza were leading the second construction phase of the Workiva headquarters at the ISU Research Park when Story Construction leadership approached them about implementing a new system on the project called Construction Production 2.0. Listen as they recall their first impressions of the system and some early lessons learned in implementing CP 2.0 for the first time.

NOW PLAYING

The First Deployment of Construction Production 2.0

0:00 42:09

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Story Way?

This episode is 42 minutes long.

When was this The Story Way episode published?

This episode was published on June 27, 2025.

What is this episode about?

In 2014, Rob Greenwood and Valarie Vizza were leading the second construction phase of the Workiva headquarters at the ISU Research Park when Story Construction leadership approached them about implementing a new system on the project called...

Can I download this The Story Way episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!