The humidity vs. heat debate, and studying the lifetime impacts of famine episode artwork

EPISODE · Aug 8, 2024 · 27 MIN

The humidity vs. heat debate, and studying the lifetime impacts of famine

from Science Magazine Podcast · host Science Magazine

Researchers debate if humidity makes heat more deadly, and finding excess diabetes cases in Ukrainian people that were born right after the 1930s famine First up this week, which is worse: the heat or the humidity? Staff writer Meredith Wadman joins host Sarah Crespi to talk about conflicting reports on the risk of increased mortality when humidity compounds heat, and how to resolve the debate in the field.     Next, LH Lumey, a professor of epidemiology at the Columbia University Medical Center, discusses what the catastrophe of a famine can teach us about the importance of maternal and fetal health for the long term. His work focuses on records of a 1930s Ukrainian famine painstakingly reconstructed by Ukrainian demographers after being obscured by the former Soviet Union. The famine records combined with newer data show that babies gestated during famine are more likely to acquire type 2 diabetes later in life.    This week’s episode was produced with help from Podigy.   About the Science Podcast   Authors: Sarah Crespi, Meredith Wadman    Episode page: https://www.science.org/doi/10.1126/science.z6yms94   About the Science Podcast: https://www.science.org/content/page/about-science-podcast Learn more about your ad choices. Visit megaphone.fm/adchoices

Episode metadata supplied by the publisher feed · Published Aug 8, 2024

Embed this episode

NOW PLAYING

The humidity vs. heat debate, and studying the lifetime impacts of famine

0:00 27:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Science Magazine Podcast?

This episode is 27 minutes long.

When was this Science Magazine Podcast episode published?

This episode was published on August 8, 2024.

Can I download this Science Magazine Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!