Skip to content
The I-90 Tunnel Collapse episode artwork

Dec 31, 2020 20 min

The I-90 Tunnel Collapse

from Brady Heywood Podcast Hosted by Sean Brady

In this episode, we head to Boston. The 'Big Dig' was a road and tunnel construction project designed to solve Boston's congestion problems. With the final project cost exceeding $14 billion USD, this megaproject took 20 years to complete. It involved constructing 25 km of highway lanes, 8 km of tunnel, 16 interchanges and 200 bridges. But on the 10th of July 2006, at 11:01 pm, a section of the I-90 tunnel collapsed unexpectedly, with tragic results. So what happened? Why did it take six years to collapse? And how could one of the most costly and complex public infrastructure projects ever undertaken in the US have failed so catastrophically? This episode follows the National Transportation Safety Board as they answer these questions, and shares insights into how such an investigation is conducted. This show is produced in collaboration with Wavelength Creative. Visit wavelengthcreative.com for more information.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

The I-90 Tunnel Collapse

0:00 20:43

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Brady Heywood Podcast?

This episode is 20 minutes long.

When was this Brady Heywood Podcast episode published?

This episode was published on December 31, 2020.

Can I download this Brady Heywood Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.