The imminent opening of Switzerland's new pool episode artwork

EPISODE · Dec 22, 2020 · 47 MIN

The imminent opening of Switzerland's new pool

from Wave Pool Mag

Adam Bonvin had a dream a long time ago and worked diligently to create it. His story is an inspiring one, where someone with a completely different background to that of a big time property developer and armed with a passion for the sport envisaged a completely new tourism offer. He is on the road to opening that dream in April 2021 and not even Covid can stop him! Good luck for the launch Adam, it was very motivating to hear your story.Nick

Episode metadata supplied by the publisher feed · Published Dec 22, 2020

Embed this episode

Ready to play

The imminent opening of Switzerland's new pool

0:00 47:06

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Wave Pool Mag?

This episode is 47 minutes long.

When was this Wave Pool Mag episode published?

This episode was published on December 22, 2020.

Can I download this Wave Pool Mag episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!