EPISODE · Oct 10, 2026 · 2 MIN
The Implementation Phase: Green Construction and Beyond
Hey! I'd love to hear your thoughts, send me a voice note. Green design only pays off if construction delivers it. This lesson covers the implementation phase of the integrated process: the construction plans that should never be overlooked (an erosion and sedimentation control plan with stormwater pollution prevention, a construction indoor air quality management plan, and a construction waste management plan that addresses recyclables), the difference between soft costs and hard costs, and why the integrative process continues after construction through training and orientation of the building's operations staff. 📚 Keep studying: - LEED Green Associate Exam Prep Course: https://projectific.com/products/leed-green-associate-exam-prep - Free LEED Green Associate exam prep (free practice exam, flashcards, and study guide sample): https://projectific.com/blogs/leed-green-associate/free-leed-green-associate-exam-prep More at https://projectific.com
Embed this episode
Ready to play
The Implementation Phase: Green Construction and Beyond
No transcript for this episode yet
Similar Episodes
No similar episodes found.