The Instigator Interview: Stadium and Arena Renovation and Design with Ryan Aylmer of Brailsford & Dunlavey episode artwork

EPISODE · Jul 7, 2025 · 36 MIN

The Instigator Interview: Stadium and Arena Renovation and Design with Ryan Aylmer of Brailsford & Dunlavey

from The Instigator Podcast · host Chris Ostrander

New Highmark Stadium will contain a range of features that are totally foreign to the confines of the Buffalo Bills current home and KeyBank Center is poised to get renovated any time now. With both of Western New York's major sports venues in the construction crosshairs, it was a perfect time to bring in an expert in the stadium industry to offer insight and background on the process. Ryan Aylmer of Brailsford & Dunlavey joins the show for a conversation that covers the changing trends and desires of sports fans, how teams and stadiums are adapting to meet those needs and what sort of features fans can expect to see in their venues as a result.

Episode metadata supplied by the publisher feed · Published Jul 7, 2025

Embed this episode

Ready to play

The Instigator Interview: Stadium and Arena Renovation and Design with Ryan Aylmer of Brailsford & Dunlavey

0:00 36:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Instigator Podcast?

This episode is 36 minutes long.

When was this The Instigator Podcast episode published?

This episode was published on July 7, 2025.

Can I download this The Instigator Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!