EPISODE · Jan 8, 2026 · 42 MIN
The Lease & Build Podcast #2: $630K Change Order for Floor Prep with Ron Sandoval
from Lease & Build Podcast by Tenantimprovement.com · host Jeff Megow
In this episode, Jeff Megow—owner and founder of TenantImprovement.com and Floor Zone—hosts an in-depth discussion on a major $630K change order tied to floor preparation on a massive construction project. Joined by Ron Sandoval of HPS North America, the conversation dives into what triggered this significant change, the challenges encountered on-site, and how such developments impact project schedules, costs, and decision-making. Listeners will get a behind-the-scenes look at how large-scale construction projects handle unexpected scope changes, manage risk, and keep projects moving forward despite costly surprises. Don’t miss this expert-level discussion packed with real-world insights from industry leaders.
Embed this episode
NOW PLAYING
The Lease & Build Podcast #2: $630K Change Order for Floor Prep with Ron Sandoval
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.