"The Lighthaven Campus is open for bookings" by Habryka episode artwork

EPISODE · Oct 3, 2023 · 5 MIN

"The Lighthaven Campus is open for bookings" by Habryka

from LessWrong (Curated & Popular)

Lightcone Infrastructure (the organization that grew from and houses the LessWrong team) has just finished renovating a 7-building physical campus that we hope to use to make the future of humanity go better than it would otherwise.We're hereby announcing that it is generally available for bookings. We offer preferential pricing for projects we think are good for the world, but to cover operating costs, we're renting out space to a wide variety of people/projects.Source:https://www.lesswrong.com/posts/memqyjNCpeDrveayx/the-lighthaven-campus-is-open-for-bookingsNarrated for LessWrong by TYPE III AUDIO.Share feedback on this narration.[125+ Karma Post] ✓

Episode metadata supplied by the publisher feed · Published Oct 3, 2023

Embed this episode

NOW PLAYING

"The Lighthaven Campus is open for bookings" by Habryka

0:00 5:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of LessWrong (Curated & Popular)?

This episode is 5 minutes long.

When was this LessWrong (Curated & Popular) episode published?

This episode was published on October 3, 2023.

Can I download this LessWrong (Curated & Popular) episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!