Skip to content
The Midnight Frequency: "The Occupancy Light" episode artwork

Aug 6, 2026 10 min

The Midnight Frequency: "The Occupancy Light"

from The Midnight Frequency

Send us Fan Mail Ashgate signal box holds a desk, a kettle, a panel of indicator lights, and between ten at night and six in the morning a man named Ray Coburn. The panel has exactly two words in its vocabulary. Occupied, or clear. Tonight it is showing a section of the Ashgate branch occupied, which should not be possible, because the branch closed in 1984 and the rails came up in 1986. Regional Control logs it as a panel fault, category three, non-urgent, technician within fourteen days. Then section three clears and section four lights, and the arithmetic on the back of the log sheet comes out at two miles an hour. An original standalone story. Three voices. The Midnight Frequency. It's later than you think. Support the show

Episode details come from the podcast's RSS feed.

Embed this episode

Send us Fan Mail Ashgate signal box holds a desk, a kettle, a panel of indicator lights, and between ten at night and six in the morning a man named Ray Coburn. The panel has exactly two words in its vocabulary. Occupied, or clear. Tonight it is showing a section of the Ashgate branch occupied, which should not be possible, because the branch closed in 1984 and the rails came up in 1986. Regional Control logs it as a panel fault, category three, non-urgent, technician within fourteen days. ...

Ready to play

The Midnight Frequency: "The Occupancy Light"

0:00 10:46

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Midnight Frequency?

This episode is 10 minutes long.

When was this The Midnight Frequency episode published?

This episode was published on August 6, 2026.

Can I download this The Midnight Frequency episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.