EPISODE · Sep 15, 2026 · 1 MIN
The Muny’s $9.5M Transformation | St. Louis News
from St. Louis News Today | 2 Min News | The Daily News Now!
The Muny is getting a $9.5 million facelift—replacing 10,700 aging seats and tackling critical infrastructure like a new stormwater system to prevent future flooding, plus concrete repairs and sound booth upgrades. With original equipment now obsolete after 25 years, this full overhaul is essential for decades of top-tier performances. Meanwhile, the stage is being disassembled into 160 pieces and stored offsite to protect it from winter weather, with reassembly starting in March. The entire project will take 8-9 months, aiming for completion before the theater’s 109th season opens in June 2027. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Sources:https://fox2now.com/news/missouri/the-muny-begins-9-5-million-renovation-following-108th-season/ More coverage & latest updates:https://sources.thednn.ai/fc04223d34e8a58e Report issues to [email protected].
Embed this episode
Ready to play
The Muny’s $9.5M Transformation | St. Louis News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.